How do I manage and track sponsorship campaigns in the Brand Control Center?
The Brand Control Center provides campaign owners with a consolidated view of all sponsorships, making it easy to track their status (Draft, Scheduled, Live, Expired).
Key capabilities include:
- Campaign Management: Easily edit, pause, resume, or duplicate campaigns without requiring assistance from Genuin support.
- Performance Insight: Access sponsorship-specific analytics to evaluate performance and inform future optimization strategies.
Additionally, the ability to export data as a CSV allows brands to integrate sponsorship information directly into their existing BI (Business Intelligence) and reporting pipelines.
Guide - Campaign Lifecycle Management
1. Understand Sponsorship States
Sponsorship campaigns can have the following statuses:
- Draft: The campaign's initial configuration is complete, but it has not yet been scheduled.
- Scheduled: The campaign is ready and will automatically go Live at the specified start time.
- Live: The campaign is currently running and delivering content.
- Expired: The campaign has concluded, either because the end date was reached or it was manually paused.
Note: The Pending Approval status is defined but is not utilized in the current phase.

2. Transitions
Here's how sponsorship campaign statuses transition:
- Draft campaigns are manually moved to Scheduled.
- Scheduled campaigns automatically become Live at their defined start date/time.
- Live campaigns transition to Expired when either:
- The end date is reached.
- The configured budget is exhausted.
- A Live campaign can be manually set to Expired by using the Pause function.
- The Resume function can reactivate an Expired campaign, provided its dates and configuration remain valid.
3. Edit Rule by State
The ability to modify sponsorship campaigns in the Brand Control Center varies based on the campaign's status:
Draft/Scheduled Campaigns:
- Title
- Posts
- CPM (Cost Per Mille)
- Budget
- Sponsoring Brand
- Start Date
- End Date
- Payment Type
Live Campaigns:
- Title
- Posts
- End Date

You cannot edit the following once a campaign is Live:
- CPM (Cost Per Mille)
- Budget
- Sponsoring Brand
- Start Date
- Payment Type
4. Use the Three-Dot Menu Actions
The following actions are available for managing sponsorship campaigns based on their status:
| Status | Available Actions | Notes |
|---|---|---|
| Draft | Edit, Delete, Schedule to Live | Deleting a Draft requires confirmation |
| Scheduled | Edit, Delete | |
| Paused | Edit, Resume | Resuming checks for valid dates and configuration. This status applies when a sponsorship has expired because it was paused. |
| Live | Edit, Copy to Draft, Pause | Editing is restricted to specific fields. |
| Expired | Edit, Resume | This status applies to sponsorships that reached their natural end. Dates may need to be updated before resuming. |
Schedule to Live

Once all required fields are complete

A confirmation pop-up will then appear, stating "Sponsorship scheduled."

If you have not filled in all mandatory fields, a confirmation message will display, prompting you to select the appropriate next step.

Delete Draft

A confirmation window will pop up to verify your selection.

Once you confirm the Delete action, a confirmation message will appear: Draft Deleted.

Managing Live Sponsorships
You can make the following edits to an active sponsorship:
Edit Sponsorship Details
- Add or remove Posts.
- Modify Post-level metadata.

Once you have completed all necessary modifications or changes, click Next to finalize the details. A pop-up window will then prompt you to either Save or Discard the changes.

A message confirming "Changes Saved" will then be displayed.

Copy to Draft
You can copy an active Live Sponsorship into a draft.

A confirmation message, "Sponsorship copied," will then be displayed.

Pause Sponsorship
You can copy a live sponsorship into a draft mode.

A confirmation window will appear, prompting you to choose whether or not to pause the Sponsorship.

Once the message is confirmed, the status will display as "Sponsorship paused."

Resume Sponsorship
- For sponsorships that are paused or have ended.

A confirmation window will pop up, allowing you to make your selection based on the specific requirements.

After confirming, select the "Resume Sponsored Post" option.

5. Filter and Find Sponsorships
In the Sponsorship tab, users can filter campaigns using the following criteria:
- Status (Draft, Scheduled, Live, Expired)
- Sponsorship Name
- Brand
Note: Sort and view options will not be available in the current phase.


View Analytics in Brand Control Center
You can access analytics for each sponsorship in the right-hand panel.
- 1 view = 3-second video play. This definition is directly related to how the Cost Per Mille (CPM) is calculated.
- For a complete breakdown of all metrics, please refer to the spec sheet here: https://docs.google.com/spreadsheets/d/1oTmXUv3dQ4eLkyDo8_uJtK1EB3otsbQcrx48jlMmwT8/edit?gid=2123767513#gid=2123767513
- Revenue Formula: Revenue = (Impressions / 1000) × CPM
Download CSV Reports
From the Sponsorship tab, you can access data download options:
- Sample CSV: Download a sample CSV format here: https://docs.google.com/spreadsheets/d/1PAnl1S49_pWS1-8v0B6luwJltmasD54yzExlHJb63f0/edit?usp=sharing
- Actual Data: Download the actual sponsorship data for your campaigns as a CSV file.
Download Status Messages:
- Success:
- "CSV download started" (when the process is initiated).
- "CSV downloaded successfully" (when the download is complete).
- Failure:
- "Failed to download CSV. Try again."

Permissions: Who Can Do What
The permissions for managing and tracking sponsorship campaigns are detailed in the full permissions matrix available here: https://docs.google.com/spreadsheets/d/1tMjQx1aytpl0JKFxEIrW3BBT4Ji933_SiWSbDuILKkg/edit?gid=878754748#gid=878754748&range=HG1:HR1.
In summary, the actions allowed for each user role regarding Sponsorship campaigns are:
| User Role | Actions Allowed |
|---|---|
| Owner | Create, Edit, Delete, View |
| Admin | Create, Edit, Delete, View |
| Content Manager | Create, Edit, Delete, View |
| Viewer | View Only (Cannot Create, Edit, or Delete) |
Troubleshooting & Common Issues
This section outlines common issues and their solutions when managing and tracking sponsorship campaigns:
A. Cannot Schedule a Draft Sponsorship
- Cause: Not all required fields have been completed.
- Behavior: Scheduling is blocked, and the message "Complete all required fields before scheduling" is displayed.
B. Sponsorship Not Delivering
Action: Verify the following points:
- The sponsorship State is Live.
- The End date is set in the future.
- The allocated Budget has not been exhausted.
- The relevant Placement is enabled in Ad Config.
- The Placement is part of an active ad preset.
C. Resume Action Fails
- Cause: Typically occurs due to invalid or past dates, or missing required configuration.
- Solution: Update the configuration (especially dates) and attempt the resume action again.
D. General Lifecycle Action Failures
Failures in actions like schedule, pause, resume, delete, or copy will result in error messages such as:
- "Failed to schedule sponsorship. Try again"
- "Failed to pause sponsorship. Try again"
- "Failed to resume sponsorship. Try again"
- "Failed to delete sponsorship. Try again"
- "Failed to copy to draft. Try again"
E. Draft / Edit Save Failures
When saving a new draft or editing an existing sponsorship, you may encounter:
- "Failed to save the draft. Try again"
- "Failed to save changes. Try again"
Rules & Key Considerations
- Campaign must be complete before scheduling
- Live campaigns have limited edit access
- Budget exhaustion ends campaign early
- Draft campaigns do not auto-go live
Specs & Limitations
- Fixed State Machine: Campaigns follow a strict progression: Draft > Scheduled > Live > Expired. The 'Pending Approval' state is not currently in use.
- Limited Live Edits: Once a sponsorship is Live, only the Title, associated Posts, and the End Date can be modified.
- Handling Paused Campaigns: Paused sponsorships are functionally treated as Expired regarding both their state and content delivery.
- Resumption Requirements: To resume a paused campaign, the End Date must be valid (in the future). Campaigns that have already passed their scheduled End Date must be updated before they can be resumed.
- Permissions: User roles (Owner, Admin, Content Manager, Viewer) dictate the permissions for managing sponsorships.
Example Scenarios
Scenario 1: Campaign Optimization
Track impressions - adjust CPM for future campaigns
Scenario 2: Pause & Resume
Pause underperforming campaign - resume later with updates
Scenario 3: Reusing Campaigns
Copy high-performing campaign - relaunch quickly
FAQs
1. Can I edit a live campaign?
Partially. CPM, budget, and type cannot be changed.
2. What happens when the budget is exhausted?
Campaign automatically moves to Expired
3. Can I restart an expired campaign?
Yes, using Resume, after validating configuration.
4. How is revenue calculated?
Based on CPM and impressions (3-second views).
Future Enhancements
- Advanced analytics dashboards
- Real-time optimization controls
- Automated pacing
- Integrated billing & payouts